Periodically check the performance of the generator set
- Jan 26, 2018 -

After running for a while, the generator set to do regular inspection, long line units every 6-8 hours should be checked, standby units in the shutdown after the check again, check the site can be the following aspects: Lubricating oil residue, air filter obstruction indicator, coolant level, radiator and external ventilation, Engine Transmission Belt Group, fuel oil supply and so on. After each operation 50 hours, to discharge water separator in the water and check the start-up battery electrolyte level; The new unit running 200-300 hours, to check the valve clearance and check the injector: After each operation of the generator set 400 hours, need to check and adjust the transmission belt, if necessary, to replace, Check the cleaning radiator chip and the sludge in the fuel tank; for every 600 hours or at least every 12 months, lubricating oil and lube filters need to be replaced, and the frequency of the unit replacing the lubricating oil cycle varies according to the quality of the lubricating oil and the sulfur content of the fuel and the consumption of the lubricating oil of the generator set, each running 800 hours, To change the oil-water separator and the fuel filter, check whether the turbocharger is leaking, check the inlet pipe for leakage, inspect and clean the fuel pipe, adjust the valve clearance after each 1200 hours operation, and replace the air filter and coolant after every 2000 hours, and thoroughly clean the radiator chip and waterway 2,400 hours after each run, check the injector, thoroughly check the cleaning turbocharger, fully check the engine equipment.